The ASIC (Application-Specific Integrated Circuit) design flow

The ASIC (Application-Specific Integrated Circuit) design flow is a comprehensive process that involves several stages, from initial concept to final fabrication. Each step is crucial to ensure the final product meets the desired specifications and performs correctly

Here is an overview of the typical ASIC design flow:


1. Specification

  • Requirements Gathering: Define the functional and performance requirements for the ASIC.
  • Specification Document: Create a detailed document outlining the specifications, including functionality, performance metrics, power consumption, area constraints, and interface requirements.

 

2. Architecture Design

  • High-Level Design: Develop a high-level block diagram of the ASIC, specifying the main components and their interactions.
  • Micro-Architecture: Detail the internal architecture, including data paths, control logic, memory organization, and interconnects.

 

3. RTL (Register Transfer Level) Coding and Functional Verification

  • Coding: Write the RTL code using hardware description languages (HDLs) such as Verilog or VHDL.
  • Testbench Development: Create a testbench to simulate and test the RTL design under various scenarios.
  • Simulation: Use tools to simulate the design and check for functional correctness.
  • Coverage Analysis: Ensure all parts of the design are tested by analyzing code coverage metrics.
  • Formal Verification: Apply formal methods to prove the correctness of the design with respect to certain properties.

 

 4. Logic Synthesis

  • RTL to Gate-Level: Convert the RTL (behavioral model) design to a gate-level netlist (structural modeling) using synthesis tools.
  • Optimization: Optimize the design for performance, area, and power, while meeting timing constraints.
  • Timing Analysis: Perform static timing analysis (STA) to ensure the design meets timing requirements.
NOTE: Design for Testability (DFT) insertion is also done at this stage by DFT team.
  • DFT Insertion: Insert test structures such as scan chains and built-in self-test (BIST) mechanisms to facilitate testing.
  • Test Pattern Generation: Generate test vectors for manufacturing testing.

 

5. Physical Design

In Physical Design the gate-level netlist is converted to GDS (Graphic Data Stream) format.
GDS: A file format used to represent layout Data.

I) Floorplanning

  • Chip Planning: Define the physical layout of the ASIC, including the placement of major blocks, I/O pads, and power grids.
  • Power Planning: Plan the power distribution network to ensure adequate power delivery.

 

II) Placement and Routing

  • Placement: Place the synthesized cells on the chip according to the floorplan.
  • Routing: Connect the cells with metal layers, ensuring signal integrity and meeting design rules.
  • Clock Tree Synthesis: Design and optimize the clock distribution network.

6. Physical Verification, Sign-Off and Tape-Out

  • DRC (Design Rule Check): Ensure the design meets the foundry's manufacturing rules.
  • LVS (Layout Versus Schematic): Verify that the layout matches the schematic/netlist.
  • Antenna Check: Check for antenna effects which can cause damage during fabrication.

 

Sign-Off

  • Timing Sign-Off: Perform final static timing analysis.
  • Power Analysis: Conduct power analysis to ensure the design meets power specifications.
  • Signal Integrity Analysis: Check for issues like crosstalk and electromigration.
  • Formal Verification: Re-verify the design to ensure no changes have introduced errors.

 

Tape-Out

  • GDSII Generation: Convert the verified layout into GDSII format, the standard format for fabrication.
  • Fab Submission: Send the GDSII file to the semiconductor foundry for manufacturing.

 

7. Fabrication

  • Wafer Fabrication: The foundry manufactures the ASIC on silicon wafers.
  • Packaging: The wafers are diced into individual chips and packaged.
  • Testing: The packaged chips are tested to identify any manufacturing defects.

 

8. Post-Silicon Validation

  • Silicon Debug: Test the fabricated ASICs to verify functionality and performance.
  • Field Testing: Deploy the ASICs in real-world scenarios to ensure they meet all operational requirements.

 

9.  Production, Deployment and Maintenance

  • Mass Production: Once validated, the ASIC goes into mass production.
  • Yield Improvement: Work with the foundry to optimize the manufacturing process and improve yield.
  • Deployment: The ASICs are deployed in the final product.
  • Maintenance: Monitor the ASIC performance in the field and address any issues that arise.